Plan the installation properly.

Comprehensive site assessment, electrical single-line engineering, mechanical mounting, cable terminations, and safety sign-off across the UAE. We eliminate site guesswork with certified installation protocols.

Delivered Scope

What our installation covers

  • ✓
    Site load profile analysis & orientation audit:Measurement of peak demand, continuous baseloads, and shading analysis.
  • ✓
    Mechanical positioning & foundation verification:Ground compaction checks, crane rigging coordination, and wind-load anchoring.
  • ✓
    AC/DC cabling, earthing & protection:Armored power cabling, earth pit installation, and circuit breaker coordination.
  • ✓
    Inverter commissioning & telemetry setup:Grid-forming inverter synchronization, load bank testing, and cloud telemetry activation.
  • ✓
    Handover documentation & training:As-built Single-Line Diagrams (SLD), test certificates, and on-site staff safety training.
Equipment Compatibility

Eligible systems & hardware

Our certified installation teams handle all Solynx equipment categories and compatible commercial hardware:

Industrial BESS (up to 500 kWh)Expandable Solar ContainersCommercial DC Fast ChargersOff-Grid Solar CabinsHybrid Power Skids
Standard Scope Exclusions

Clear boundaries for project clarity

  • •Major civil excavation or concrete foundations beyond standard precast equipment pads.
  • •Structural roof modifications without certified structural engineer approval.
  • •Third-party grid interconnection fees charged directly by local utility providers.
Execution Process

4-Step turnkey deployment methodology.

Every installation follows rigorous electrical engineering protocols ensuring safety, compliance, and guaranteed asset longevity.

01Phase 01

Technical Survey

On-site audit measuring solar irradiance, cable distances, switchgear capacity, and soil resistance.

Key Output

Site suitability audit & preliminary SLD.

02Phase 02

Method Statement

Preparation of stamped engineering drawings, cable sizing schedules, and project RAMS.

Key Output

Approved RAMS & permit package.

03Phase 03

Mobilization

Coordinated transport, crane placement, secure anchoring, and high-voltage electrical terminations.

Key Output

Mechanical and electrical placement.

04Phase 04

Testing & Sign-off

Insulation resistance testing, load bank test run, telemetry calibration, and client handover.

Key Output

Signed commissioning certificate.

Installation Questions

Common questions about turnkey installation

Solynx electrical engineering specialists draft and deliver all Risk Assessment and Method Statements (RAMS), Single-Line Diagrams (SLD), and equipment safety data sheets prior to mobilization.

Ready to schedule an installation survey?

Share your project location and equipment specifications. Our electrical engineering team will deliver a comprehensive method statement and quote.